


A survey before the installation
The first customer needs a socket location checked. The second is expecting an installation at eleven. Between them, the installer can collect the bracket ordered for the job.
8:30
Leave the workshop
9:00
Survey the first site
10:00
Collect the bracket
11:00
Meet the customer
Between installation jobs
Add the site address
Read the service location from the work order. Check the street number and the pin before saving the stop.



Keep the booked visit last
Choose the installation as the finish. Compare the proposed order and check that the bracket can be collected before you need it.



Find the service entrance
Keep the site contact’s entrance directions with the stop. Open the address in your usual maps app for the drive.





Track the return call
Mark the survey complete when you leave. If another visit is needed, keep the return appointment in your work calendar.



